Nassau's Capital Re-Investment Summary

Nassau has reinvested over $150,000 of capital to upgrade and enhance the pool and facility. Below is a summary of the major expansion and upgrade additions from 2004 - 20010.

1. Sandblasting of Large Pool - 2008 & 2009
2. New Filtration System - 2004
3. 2 New Diving Boards - 2007
4. New Pool Drains - 2009 (to be in compliance with Federal Law)
5. Upgrade of Snackbar Ansul System -2009
6. Pool Well- lengthen of depth - 2006
7. Upgrade of Mens and Ladies Room - 2005
8. New Pool Slide -2005
9. Various concrete and fencing installation - 2007 & 2008
10. Pool lighting - 2004 & 2006
11. Extension of Snackbar roof - 2004
12. Upgrade of pool skimmer-2008
13. Addition of Snackbar equipment including refrigerator, fryer - 2008
14. Pool pump - 2004
15. Pool Gas Grills and Storage Shed - 2006
16. New Nassau Pool Sign - 2006
17. Security System - 2009
18. Hydroblasted Baby Pool - 2010
19. Resurfaced 1 Diving Board - 2010
20. New Lifeguard Stands (2) - 2010 (replaced after 50 years)
21. Replaced concrete on bridge - 2011
22. Replaced 10 concrete blocks in breezeway - 2011
23. Replaced 3 phase electrical post - 2011
24. Replaced Pump in Main Pump House - 2011
24. Replaced 10 concrete blocks in diving board area - 2012
25. Excavated and repaired damaged pipes and electrical under diving board area - 2012
26. Replaced roof on baby pool pump house - 2012
27. Repaired and replace service gate - 2012